From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Dexter R. Lovrien 1527 S Cedar Dr Apache Junction, AZ 85120 480-980-1763 dexter2002@earthlink.net EXPERIENCE 9/29/2014-12/31/2015
NOKIA, Irving, Texas (MindLance contractor) Quality
Control Center Data Manager – T-Mobile LTE “Rural America” and “Green Field”
projects * Work with
Delivery Support (DS) staff with the close out process * Assist
suppliers with Site Close Out Package (SCOP) submissions and punch list
uploads * Responsible
for collection of “Green Field” SCOPs & Punch Lists from South and West
regions * Assure SCOPs
and punch lists are turned in when promised * Assure work
is complete, accurate & meets RFDS & NTP requirements before sending
to TMO * Help develop
the current SCOP & punch list procedures * Work with
the Vendor Management staff as required * Tools used –
IFM & IPM 3/3/2014 -
4/5/2014Project Resources Solutions LLC, Dawsonville, GA Field Engineer
– ATT Spectrum Clearing Project (OH, NC/SC & GA mkts) * Re-cable and
re-CAL SC-4812T and ET sites acquired from AWCC/Alltel to ATT frequencies. * Re-tune 2:1
combiners as required. 7/21/2013 -
2/7/2014 Samsung Telecommunications America (The Goal/World Link
contractor) IMP Engineer –
SPRINT Network Vision project (Cleveland, Detroit, Pittsburgh mkts) * Install
CAT-5 cables, configure router and DU cabling. Verify T1s at Telco box. * Load CSR
router and DU shelves with site specific software. * Verify
proper operation of alarm functions thru UDAs. * Make test
calls on 1X, EVDO and LTE to assure proper sector, p/n and speed test. * Clear alarms
and trouble shoot sites issues. * Document and
photograph progress. 10/29/2012 -
5/21/2013 FMHC Construction, Phoenix, AZ Construction
Manager – NSN/T-Mobile LTE “Modernization” project * Provide
logistical support to general contractors as needed. * RMA
defective FLEXI system modules, radios and fibers. * Conduct site
walks, pre-construction meetings and post work inspections. * Represent
FMHC on daily supplier calls and weekly face-to-face meetings. * Oversee
completion of permits & closeout documentation. * Assure work
matches RFDS and NTP requirements. * Commission,
integrate & call test 2G/3G & LTE sites when needed. Have PTID. 8/13/2012 -
10/20/2012 TechUSA, Charlotte, NC Field Service
Engineer – NSN/Verizon switch project * Install
CAT-VE 6509 system in new VZW Little Rock, AR switch facility * Bolt-down
frames, terminate DC power. Route and install fiber cables.
Install “toy cell” BTS frame * Route and
lace T3 coax. Route, lace and terminate CAT6e cables 5/3/2012 -
7/3/2012 Skyhawk Wireless Staffing, Laguna Hills, CA Field
Technician/Site Auditor – NSN/T-Mobile LTE “Modernization” project * Photograph
existing site, BTS, ancillary cabinets, feed-line and antenna/TMA details * Document
existing tower & ground space usage & availability * Prepare
PowerPoint template using site photos * Measure and
prepare drawing of complete site location * Populate
.xls template with antenna, TMA, SSC, BTS information and other details 5/10/2010 -
4/14/2012 Insight Global, Inc., Charlotte, NC Assistant
Project Mgr – Nokia Siemens Networks (NSN) – Verizon Carolinas account team * Review
weekly deployment list and develop an efficient plan and schedule for
install
crews to install Motorola SC-4812 BTS frames, EVDO upgrades and carrier adds * Train crews
to assure installation of BTS frames, upgrades & carrier adds
meet
NSN/Verizon procedures and standards * Provide
logistics support & inventory tracking & control of spares, tools
& expendables * Generate
reports and map overlays as required by project manager * Assist
project manager with other duties as required * Track
scheduled and completed work, escalating as needed. * Assist crews
in locating cell sites using Google Earth & Street Atlas 2010 PLUS * Maintain and
update site location spreadsheet as new sites added * Write
installation manual to assure all crews working to same standards * Assist
warehouse liaison in tracking BTS frames & kit inventory * Install
SC4812 BTS & UBS frames in DAS, special complex & high priority
locations * Communicate
daily status with crew of 50, project management and counterparts 6/8/2009 -
3/31/2010 TEKsystems, Inc., Dallas, TX Field
Technician – Clearwire’s nationwide WiMax (4G) deployment * Install,
configure and path Dragonwave Duo microwave units * Respond to
trouble tickets as needed * Adjust
electronic down-tilt (RET) of antennas as needed * ATP & cluster
drive test using X-CAL, WiTT and DAPSAT software and procedures. * Install
Valere rectifier & battery string in new sites. * Assist
Clearwire field techs, rf engineers & tower crews as required. 1/28/2009 -
6/1/2009 C J Telecomm Inc., Los Angeles, CA Field
Technician – Level 4 * Install
Fujitsu 4100 router, DSX panel, Valere rectifier & battery shelf in
customer premises for ADC COX/AT&T/VZW fiber project in Phoenix, AZ * Assist ADC
leads with assorted work at CO (fiber testing, duct install etc.) -- Level 2 10/6/2008 -
11/15/2008 C J Telecomm Inc., Los Angeles, CA Field
Technician – Level 3 * Install
CISCO 10K router systems for ADC at Comcast head ends in Portland, OR area * Prepare, run
& terminate 75 ohm coax, fiber, CAT5e & power cable. * Sew &
lace cables as required to insure a neat, secure installation. * Inventory
incoming parts shipments 5/11/2008 -
9/13/2008 Solus Technical Resources, LLC., Woodstock, GA Lead Field
Engineer * Led crew
installing EVDO expansion SC-4812T, MC & ET frames as part of
Velocitel/Motorola project for Verizon in North & South Carolina markets * Work
involves bolt-down, power, rf & router cabling. Also carrier adds
at some sites * Provide
daily reporting to Velocitel & Motorola project managers. 3/2006 -
4/19/2008 InfraCell Inc., Tualatin, OR Assistant
Project Manager * Led crews in
deployment of EVDO Rev. 0 & Rev. A, 2G to 3G packet upgrades, upgrading
from Rev. 0 to Rev. A & cable redress projects in many ALLTEL
markets. * Work
included installation of expansion SC-4812MC frames in some markets. * Assured crew
was supplied with proper tools, test gear (8921A, HP435B power meter, El Gato
test set) & market specific access information. * Provided
daily status reporting to Motorola & Alltel management. * Maintained
inventory records of project materials/kits. * Worked with
Motorola Project mgmt & Alltel market to schedule deployment of upgrade
with as little impact as possible on market operations. * First point
of contact for field crew, Alltel field techs & Motorola project
management. * Worked with
senior Motorola BTS Engineers in development, refinement and dissemination of
many MOPs, procedures & training of field crews. 1/2005 -
12/2005 InfraCell Inc., Tualatin, OR Cellular Field
Engineer * Installed
EVDO upgrade on SPRINT Wireless SC-4812, ET, ET Lite & 480 sites. * Loaded
MCC-DO cards with code and SPA data using LMT. * Installed
additional carrier hardware as needed for EVDO carrier. * Loaded &
calibrated BTS frames using WinLMF & CyberTest following upgrade. * Performed
EBR to IBR procedure as required for EVDO upgrade on ET Lites. * Tested and
documented performance of EVDO carrier using CAIT & SCFT procedure. * Hot-swap
SC-4812 ET in place of ET Lite to increase capacity & add EVDO carrier. * Troubleshot
SPAN, CSU & associated components to assure proper EVDO operation. * Assisted
MOTOROLA field & system engineering to meet customer requirements. * Interfaced
with MOTOROLA CBSC & Sprint Switch and NOC personnel. 10/2004
-12/2004 InfraCell Inc., Tualatin, OR EVDO Drive
Test Team * Supported
MOTOROLA system engineering team with drive testing during FOA deployment of
EVDO system for Verizon Wireless. * Collected
EVDO performance data using CAIT & SCFT (Single Cell Functionality Test)
procedures were developed and refined. * Assisted in
the development of the SCFT procedure, generate drive test routes &
determine metric test locations. 2/2004 -
10/2004 InfraCell Inc., Tualatin, OR Cellular Field
Engineer * Replaced
CISCO routers (warranty issue) of Verizon's N/S Carolina markets * Installed
SC-4812T starter & expansion frames (including bolt-down, power & rf) * Completed
"punch list" items to meet customer expectations. * Assisted
Motorola and Verizon engineers as required to complete sites on schedule. 11/2003 -
12/2003 VariTech Sicklerville, New Jersey Quality
Assurance Auditor * Working with
a tower climber, photographed and documented existing state of Cingular cell
sites in west Texas following the installation of GSM frames. * Noted
deficiencies in weatherproofing, improper color coding of rf cables,
inadequate ground systems, azimuth, mechanical & electrical down tilt of
antennas etc. compared with customer’s current site documentation.
Noted structural or site issues. 2/2003 -
8/2003 OXFORD GLOBAL RESOURCES, Beverly, MA Cellular Field
Engineer * Installed
CISCO routers to facilitate 3G upgrade of Verizon's N/S Carolina markets * Installed
SC-4812T starter & expansion frames (including bolt-down, power & rf) * Completed
"punch list" items to meet customer expectations. * Assisted
Motorola and Verizon engineers as required to complete sites on schedule. 12/2000 -
8/2002 MOTOROLA, Schaumburg, ILL Cellular Field
Engineer * Performed 1X
3G carrier new builds, up-grades & expansions * Completed
final installation and up-grades, loaded software, calibration, optimization
& acceptance testing (ATP) of SC-4812 family BTS stations in Southwest
ALLTEL markets. * Assisted
fellow CFEs with the installation and commissioning of new switch systems. 8/1996 -
12/2000 KELLY SERVICES, Tempe, AZ Drive Test
Team member contracted to MOTOROLA, Phoenix, * Collected
and processed CDMA system performance data for review by MOTOROLA and
CellularONE/ALLTEL system engineers. * Trained new
drive team members. 11/1996 -
4/1997 National Mobile Television, Torrance, CA “A-2” Audio
crewman * Assisted
“A-1” Senior Audio Operator with production of Phoenix Coyotes professional
hockey and preseason baseball games. 8/1980 -
8/1996 KAAL TV-6, Austin, MN Broadcast
Engineer/ENG van operator * Operated and
maintained Master Control. Trained new Master Control operators. * Operated and
maintained 2 Ghz "LIVE NEWS" (ENG) van. Trained new van
operators. * Generated
and maintained stations CAD drawings & oversaw PCB board development. * Served as
EIC (Engineer in Charge) of multi camera (EFP) electronic field production
truck. * Assisted in
the design, development and construction of the ENG van, field production
truck, 2 generations of automated commercial playback system and other
projects. 6/1969 -
6/1980 RADIO SHACK, Ft. Worth, TX Assistant
District Manager, Store Manager, Assistant Store Manager, Salesman * Set-up
stores, trained sales force and opened dozens of new stores in upper Midwest
as company grew from 375 to +11,000 retail stores. EDUCATION 5/1982 Austin
Area Vo/Tech Institute (now Riverland Community College), Austin, MN 2 year course
in basic electronics as applied to color television broadcasting and
reception. Graduated with Certificate of Occupational Proficiency in
Color Television Technology (May 1982) 5/1969
O'Gorman High School, Sioux Falls, SD General
studies w/year-long, 1/2 day course in TV Production/Direction in senior
year. AFFILIATIONS 8/1986 -
7/1996 Boy Scouts of America Scoutmaster, District Commissioner & several
other roles within the Spamland District of the Twin Valley Council (Mankato,
MN) 1989 - Asst
Scoutmaster - National Scout Jamboree 1993 -
Scoutmaster - National Scout Jamboree 1993 -
District Award of Merit - Spamland District, Twin Valley Council (Mankato,
MN) COURSES BTS610
SC-4812ET CDMA Base Transceiver Station (Trunked) 1/14/2005 PPC RP-210 w/
SP-½-UNIVD press frame crimp tool for ½” SUPERFLEX rf cable NSN
Flexi-Radio 2G/3G & LTE Installation/Commissioning/Integration 2012-13 LICENSES/CERTIFICATIONS FCC General
Radiotelephone Operator issued: 1/2/1985
expires: n/a (lifetime) PTID
NSN/T-Mobile Flexi 2G/3G & LTE OSHA 10 hour |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|